// Revision 1.3, 14/03/2015 shabir // Beam-pipe for MUCH, material: Aluminium // till 110cm no changes, cone from z = 110 (at 1.25 deg) -120 (at 4.3 deg) // lead as part of beam pipe as well as 1st absorber shielding // from z = 120 - 180 cm and from 2.9 - 5.7 deg // from z >180 beam-pipe r_in = Z*tan(2.9)+10mm, 1cm left for clamp connection // 5mm beam-pipe thickness from 180cm // $Id: pipe_newvac.geo,v 1.2 2006/02/03 14:16:13 hoehne Exp $ // History of cvs commits: // $Log: pipe_newvac.geo,v $ // Revision 1.2 2006/02/03 14:16:13 hoehne // update because of slightly modified rich.geo // // Revision 1.1 2005/09/20 09:27:49 friese // Modified beam pipe in sts // // - Revision Johann M. Heuser, 21.7.2005 // - new geometry for the vacuum section: barrel-like shape // - diameter at z=1700: reduced from // Revision for Much: continuous pipe //---------------------------------------------------------- pipe1 cave PCON aluminium 7 0. 360. -50. 25. 25.5 -25. 25. 25.5 -15. 400. 400.5 230. 400. 400.5 240. 10. 10.5 1100. 24. 24.5 1250. 94. 94.5 0. 0. 0. 1. 0. 0. 0. 1. 0. 0. 0. 1 pipevac1 cave PCON vacuum 7 0. 360. -50. 0. 25. -25. 0. 25. -15. 0. 400. 230. 0. 400. 240. 0. 10. 1100. 0. 24. 1250. 0. 93. 0. 0. 0. 1. 0. 0. 0. 1. 0. 0. 0. 1 pipe2 cave PCON lead 2 0. 360. 1250. 63. 124. 1850. 94. 184. 0. 0. 0. 1. 0. 0. 0. 1. 0. 0. 0. 1 pipevac2 cave PCON vacuum 2 0. 360. 1250. 0. 63. 1850. 0. 94. 0. 0. 0. 1. 0. 0. 0. 1. 0. 0. 0. 1 pipe3 cave PCON aluminium 4 0. 360. 1850. 104. 109 4000. 212. 217 7000. 212. 217 7050. 135. 140 0. 0. 0. 1. 0. 0. 0. 1. 0. 0. 0. 1 pipevac3 cave PCON vacuum 4 0. 360. 1850. 0. 104. 4000. 0. 212. 7000. 0. 212. 7050. 0. 135. 0. 0. 0. 1. 0. 0. 0. 1. 0. 0. 0. 1 //